PREV
NEXT
  • Environment

    Survey, Remediation, Brownfield Recycling, Expert Witness Consulting

  • Construction

    Geotechnical Engineering, Pollutant Registry, Deconstruction, Disposal

  • Energy

    Building Energy Consultation, Energy Efficiency, Energetical Renovation

  • Consulting

    Project Management, Organisational Consulting, Data Management

Timeframe: 1996 - present

Client: Karl Mayer Textilmaschinenfabrik GmbH

Project volume: 260.000 € (engineering services)

Project description:

Detailed investigation/risk assessment of a complex environmental damage caused by LHKW (volatile halogenated hydrocarbons) on the site of a textile machine factory. Performance of long-term pumping tests with purification of the groundwater via an UV-Oxidation plant.

KarlMayer01

KarlMayer02

 

Preparation of a remediation plan for the remediation of the groundwater using innovative remediation methods (e.g. microbiology, in-situ chemical oxidation) up to the approval stage. Groundwater monitoring with documentation and expert evaluation of the results. Engineering supervision of the overall measure and coordination of all measures with the relevant authorities and the other parties involved in the project.

Services HYDRODATA:

  • Process comparisons and feasibility studies
  • Redevelopment concept
  • Performance of laboratory tests
  • Performance of field tests
  • Groundwater monitoring
  • Execution planning
  • Permit management
  • Monitoring and documentation of biological in-situ remediation
  • Coordination with specialist authorities

download pdf

KarlMayer03